Page Header

 

Homepage

Christian Education

Networking & Internet

My Background

Hobbies & Interests

links

Email Me

 

The Story!
In preparation to see the smog ref I put on all the smog components for the 1969 engine that I could. However, I could not put on a stock thermostatically controlled air cleaner (which ended up being the only thing I got gigged for). I have obtained a VW bus air filter (which mounts to the side instead of the top of the carb) in the event I'm not successful in obtainning the special exemption. I also noticed the gas tank was just had an open vent to the engine compartment (yikes!), so I installed a vent cartridge in the wheel well (similar to Eric Austin's on www.Bradleygt.com). Pictures show vent before and after. The 4th & 5th pics show the last of the infamous smog items - they are a thermostatically controlled air cleaner from a VW bus or Karmon Ghia that sits beside the engine with a pipe that runs from the carburetor to the air cleaner. I had fabricate a shelf and the connecting pipe. The last picture shows the engine in its current state, after receiveing the SB 100 Certificate of Sequence in January 2009 that allowed me to reclassify the car as a 1961model, making it exempt from smog components.




The post SB100 engine shown below is has 1641cc, aftermarket fan shroud, alternator, electric fuel pump dual 40+mm Kadron carbs, Pertronix Ingnition, remote oil cooler with thermostatic switched fan and mild cam.

My To-Do List!
Following is a list of things that I have or am planning on doing. Clicking on the completed date will show a before & after picture if the item is done, or possibly a before only picture if it has not been completed yet!
Item No.
Completed?
Description
1.
10/18/07
Make sure all bolts present, nutted & tightened.
2.
10/20/07
Trade tires & wheels with Baha Bug
3.
10/24/07
Align rear bumpers, Name plate, Speedo cable
4.
10/24/07
Re-mount Seats/Shoulder Belts
5.
10/27/07
Install clear headlight covers & horn
6.
11/05/07
Install missing SMOG components/Gas tank vent system
7.
11/11/07
Shelf extension/Battery Cover/Rearview mirror
8.
11/26/07
Align top/Install headliner
9.
12/23/07
Install heater ducts
10.
01/12/08
Rewire, fuse blocks, terminal strips, etc.
11.
01/12/08
New LED Dashboard
12.
03/15/08
Stereo Installation
13.
07/09/08
Back window
14.
10/12/08
Make/install doors
15.
??/??/??
Misc. Details

| Opening Page | | Christian Education | | Networking & the Internet | | My Background | | Hobbies & Interests |

| Email Me |